More than a white membrane
A successful TPO installation begins with a suitable substrate and a roof plan that addresses wet materials, low areas, drains, scuppers, parapets, curbs and penetrations. The visible membrane is only one part of the assembly.
Overlay or complete tear-off
An overlay can be appropriate when the existing system is dry, stable, compatible and allowed by project conditions. A tear-off provides access to damaged insulation and decking when moisture, deterioration, excess layers or structural concerns are present.
Seams and details built for exposure
Field seams and flashing details are heat welded, and perimeter conditions receive careful attention because wind, standing water and movement often expose weak transitions first.
Schedule an inspection in Chicago
Send us the property address, the issue you are seeing and any helpful photographs. We’ll review the project and arrange the next step.
Start your estimate